Trimble Tilos 9.0 (时间和位置规划)

  • 软件大小|Size:71.1MB
  • 软件语言|Language:英文
  • 运行环境|Platform:/Win7/8/10
  • 使用方式|License:单机版
  • 更新时间|Release:2017-07-09
  • 软件评价|Rank:
  • 历史版本|Version:1
  • 下载次数|Counts:
  • 标 签|Tag:Trimble   Tilos   

软件介绍|Description ——介绍来源于互联网,具体功能以官方为准。

Trimble TILOS 9.0是用于高速公路,铁路,管道,隧道,水工程,输电线路建设等线性土木工程项目的时间和位置规划软件。 Trimble TILOS将技术和进度信息合并为一个动态计划,为用户提供比甘特图或网络图更多的信息。新版本的TILOS提供了更好的线性建设项目可视化,并改进了与Primavera项目管理软件和Trimble Business Center - HCE办公软件的集成,用于重型民用建筑起飞和数据准备。
增强可视化
Trimble TILOS版本9.0引入了一种新的甘特图格式,可以将站点布局与用户定义的项目时间框架视觉连接起来。代表项目地点的图形,如桥梁,涵洞和交叉路口以及混凝土,钢铁或土建等工作类型提供了更多的清晰度,使计划更加直观,易于阅读。新的分组和格式表示数字壁挂式格式的时间表,这种格式经常用于精益生产,以简化的方式显示进展。此外,TILOS现在可以规划和管理基础设施项目的非线性部分,以获得更完整的解决方案。
改进整合
为了简化数据交换,TILOS 9.0版本已重新设计,以改进与第三方邮件管理软件(如Primavera,Microsoft Project和ASTA PowerProject)的集成功能。改进的集成允许用户导入包括结构的详细活动数据。 TILOS版本9.0现在也可以直接使用Primavera P6本机.xml文件类型,无需将API无缝转换为TILOS中的线性调度。
Trimble TILOS version is a time and location planning software for highways, railways, pipelines, tunnels, water engineering, transmission line construction and other linear civil engineering projects. Trimble® TILOS merges technical and schedule information into one dynamic plan, giving users more information than Gantt charts or network diagrams alone. The new version of TILOS offers better linear construction project visualization and improved integration with Primavera project management software and Trimble Business Center – HCE office software for heavy civil construction takeoff and data preparation.
Enhanced Visualization
Trimble TILOS version 9.0 introduces a new Gantt chart format that visually connects the site layout with the user-defined time frame of a project. Graphics representing project locations such as bridges, culverts and intersections as well as work types such as concrete, steel or earthworks provide additional clarity, making the plan more intuitive and easier to read at a glance. The new grouping and formatting represent the schedule in a digital wall chart format, which is frequently used in lean production to show progress in a simplified manner. In addition, TILOS can now plan and manage non-linear parts of the infrastructure project for a more complete solution.
Improved Integration
To simplify data exchange, TILOS version 9.0 has been redesigned to improve the integration functionality with third-party poject management software such as Primavera, Microsoft Project and ASTA Powerproject. The improved integration allows users to import detailed activity data that includes structures. TILOS version 9.0 also now works directly with the Primavera P6 native .xml file type with no API needed for seamless conversion to a linear schedule in TILOS. 